Eaves proof build 5000 ringEaves experience supplying tunnel liners encompasses over thirty years and includes every project that had requirements in London together with a major contract in Denmark. Our knowledge and track record is unsurpassed in this market and as such, in 1988 Eaves conducted all the testing for London Underground over a two year period to develop the existing lining coating following the results of the King’s Cross Fire in November 1987. Additionally Eaves has been contracted to work with London Underground and various consultants on testing possible effects of terrorism on the London underground network.

Over the years, in addition to liners, opening sets and taper sets Eaves has also supplied various tunnelling ancillary products, some of which are shown below.

Lifting Beams

Lifting Beam lrLifting Beams

Eaves has supplied all types of ancillary equipment including Lifting beams, as shown.

The Lifting beams are used to lift opening set segments and sub-assemblies from the loco to the build gallery feeder.