10m Tunnel Set Assembly lrEaves’ is an established specialist in turnkey project management including the supply of production parts over a sustained period. This is exemplified by the successful execution of many UK infrastructure projects from 1988 with the delivery of machined segment castings for the Channel Tunnel to the Bond Street tube extension in 2015.

Over the last three decades Eaves has supplied practically all of the major UK tunneling projects including;

  • 1985-1988: Channel Tunnel
  • 1988-1989: Dockland Light Railway
  • 1988-1989: Angel Islington
  • 1988-1989: Bank Station
  • 1992-1993: Victoria Station
  • 1994-1995: Old Street
  • 1994-1997: New Jubilee Line (11 contracts)
  • 1996-1997: Moorgate to Bank
  • 1996-1997: Heathrow Terminal 4
  • 2005-2007: Channel Tunnel Rail Link
  • 2001-2002: Woolwich Docks
  • 2006-2007: St Pancras International
  • 2011-2012: Tottenham Court Road 1
  • 2011-2015: Crossrail
  • 2012-2015: Baker Street/Bond Street
  • 2014-2015: Tottenham Court Road 2
  • 2014-2015: Bond Street

Today, the Eaves is a key supplier for the London Underground Cross rail development project involving the supply of medium-sized cast and machined products in batch quantities in-line with a master schedule. For more information, please give us a call